AL-ANDALUS EXHIBITION & MUSEUM

AL ANDALUS Exhibition was a comprehensive Design & Build project, covering an area of 800 sqm. The project developed from pre-concept design, until full installation. The work involved in this project includes base build package (Civil and MEP), features high quality fit-out element, graphics elements, Audio-Visual hardware, film production, animation & CGI and interactive elements.

Key Features:

Artifacts & Exhibits: The project included the acquisition of a wide range of artifacts and collections, each requiring meticulous attention to mounting strategies. Bespoke custom-made showcases were designed and fabricated to highlight the unique aspects of each piece, ensuring that they are displayed in a secure and visually appealing manner.

This project highlights the seamless fusion of cutting-edge technology with the careful preservation of cultural artifacts, creating a captivating exhibition experience. The integration of advanced audiovisual systems, meticulous construction craftsmanship, and a distinctive exhibition design approach has made this endeavor a standout example of contemporary exhibition development.

AV Hardware & Data Center Management

  • Overseeing server rooms and networked AV infrastructure, ensuring seamless content delivery to high-resolution displays, large-format projectors, and interactive exhibits.
  • Coordinating the installation and commissioning of AV control systems, including show control, synchronization, and automation for timed experiences.
  • Managing acoustic treatments and spatial audio systems, ensuring clear, immersive soundscapes that enhance storytelling.

Showcase Engineering & Exhibit Integration

The showcases within the museum must meet stringent conservation standards while providing unobstructed visibility and interactivity. My responsibilities include:

  • Ensuring custom-designed showcases meet museum-grade specifications, including temperature and humidity stabilization, integrated lighting, and security features.
  • Overseeing mechanized display cases for rotating or interactive exhibits, requiring precision engineering and seamless automation.
  • Coordinating with conservation specialists to implement low-reflectivity glass, non-intrusive lighting, and air-tight sealing for sensitive artifacts.

Fit-Out & Gallery Coordination

Managing the fit-out for the galleries involves balancing aesthetic design with technical functionality. My work includes:

  • Ensuring material selection and fabrication aligns with both museum standards and the architectural vision.
  • Overseeing the installation of exhibition structures, including large-scale scenic elements and thematic environments.

Coordinating with specialists for interactive media installations, projection mapping, and digital interfaces that enhance visitor engagement.

Through my role, I ensure that the technical execution aligns with the museum’s vision, delivering a seamless integration of technology, infrastructure, and design to create an unparalleled cultural and educational experience.

PROJECT OVER VIEW

INDUSTRY

COMPLEX CONSTRUCTION & FITOUT

CLIENT

SHEIKH ZAYED GRAND MOSQUE

LOCATION

UAE, ABUDHABI

Scroll to Top